Share your floor plan, card formats and opening target. We will connect the display systems to your selling, storage and service needs.
Store location and floor area
Graded cards, singles, sealed products and accessories
Fixture quantities and play-space requirements
Target opening date and delivery scope
Contact FOCUS PRACTICAL BUYER WORKBOOK · UPDATED 22 OCTOBER 2026
Send one brief that every supplier can quote against.
The best comparison starts before a price arrives. A fixture request should identify the same quantities, configuration and responsibilities for all suppliers. Mark unknown information explicitly so it becomes an assumption to resolve rather than a silent difference between offers.
Decisions to record before approving the fixture
Decision
Information to record
What to verify
Site and operation
Measured plan, receiving route, merchandise mix, staff positions and play requirements.
Use a dated plan revision and flag dimensions that still need checking.
Fixture schedule
Item numbers, quantities, configuration and material or finish references.
Separate optional fittings from required base functions.
Commercial scope
Design, samples, inspection, packing, shipment and on-site work.
State inclusions and exclusions instead of assuming a complete-service price.
Use this review sequence.
Assign every fixture on the plan an item number and use the same number in the quotation.
Attach representative card holders and packaged-product dimensions, with photographs where useful.
Ask the supplier to state assumptions, sample charges, timing dependencies and the delivery basis for the actual project.
Compare the revised total only after aligning quantities and scope. A low cabinet-only price is not a complete project budget.
Record the fixture or bay reference, sample merchandise, drawing revision, checks performed, unresolved items and the person confirming the next step. Keep assumptions visible; an illustrative layout is not a tested product specification.
Send these requirementsDownload this review sheetFOCUS buyer planning guidance. Confirm the actual materials, dimensions, loads, commercial terms and local project responsibilities in the approved order documents.