Inspection & Acceptance Planning design reference

FOCUS PROJECT KNOWLEDGE

Inspection & Acceptance Planning

Define what is checked, how it is recorded and what must be closed before shipment.

STEP 01

Set an inspection basis

Use the approved drawings, material samples and itemized order. Agree the inspection scope and sampling method rather than using an undefined claim such as complete random inspection. Identify dimensions and functions that require specific records.

STEP 02

Inspect appearance and operation

Check visible finish consistency, scratches, edges, joints and glazing. Operate doors, locks, drawers and adjustable parts. Test card-holder fit and label visibility with the agreed merchandise samples.

STEP 03

Check the connected system

Verify adjacent-module alignment, mounting locations, cable routes and accessible power components. Confirm hardware quantities and any required warnings or loading labels. Fixture inspection does not replace destination electrical or building approvals.

STEP 04

Close defects before release

Maintain a defect list linked to fixture codes and photographs. Record the correction and reinspection result. Match the accepted units to the final packing list so the receiving team can reconcile the shipment.

PROJECT KNOWLEDGE

Continue Planning Your Project.

START WITH THE REAL PROJECT

Bring Us Your Card Store.

Share your floor plan, card formats and opening target. We will connect the display systems to your selling, storage and service needs.

  • Store location and floor area
  • Graded cards, singles, sealed products and accessories
  • Fixture quantities and play-space requirements
  • Target opening date and delivery scope
Contact FOCUS